Luxury tiling project by Wells Brothers

Waterproofing

Waterproofing

Quality beneath the surface. Waterproofing protects your home for decades — installed to Australian Standards, never compromised, and the most important work you'll never see.

Overview

Waterproofing

Exceptional bathrooms begin before the first tile is installed. Waterproofing is the work that protects your home for decades — and because it disappears beneath the finish, it’s the stage most easily rushed, undervalued or skipped.

We never compromise on the work hidden beneath the tiles. Correct preparation, the right membrane system, reinforced junctions and proper curing are what protect your investment long after the project is finished. It’s invisible, and it’s the most important stage of the entire build.

Behind the tiles

Behind the Tiles

What you never normally see — the complete waterproofing process that sits beneath every finished surface and protects your home for decades.

Substrate Preparation

01

Substrate Preparation

The surface is made flat, sound and dry. Movement joints are planned and any cracks addressed before any membrane is considered.

Surface Inspection

02

Surface Inspection

The substrate is checked for integrity, moisture and suitability — because no membrane performs on an unsound surface.

Priming

03

Priming

The correct primer is applied to bond the membrane to the substrate. The right primer depends on the surface and the membrane system.

Corners & Junctions

04

Corners & Junctions

Internal corners, junctions and penetrations are reinforced first — these are the points where water most often finds a way in.

Membrane Application

05

Membrane Application

The membrane is applied in the correct number of coats, to the correct coverage, extending up walls and across the floor as required.

Curing

06

Curing

The membrane is allowed to fully cure before any tiling begins. Rushing this stage is one of the most common causes of failure.

Flood Testing

07

Flood Testing

Where applicable, the area is flood tested before tiling so any issue is found and fixed while it is still easy to reach.

Tile Installation

08

Tile Installation

Only once the membrane is fully cured and tested does tiling begin — the waterproofing is protected, and the finish is laid over a sound base.

Why it matters

The Most Important Work You’ll Never See

Waterproofing is invisible once a project is finished — and because you never see it, it’s the stage most likely to be rushed or undervalued. It is also the stage that protects everything above it.

Why failures happen

Most waterproofing failures come from poor preparation, rushed curing or missed junctions — not the membrane itself.

Why repairs are expensive

Failed waterproofing means removing tiles, fixtures and finishes to reach the membrane beneath — often the entire room.

Preparation matters more than tiles

The surface beneath the membrane decides whether the membrane performs. No membrane can compensate for a poor substrate.

Protection for decades

Correctly installed waterproofing protects your home for the life of the bathroom — quietly, and without a second thought.

The Most Important Work You’ll Never See

Standards

Installed to Australian Standards

We follow the appropriate Australian Standards for waterproofing wet areas. The detail matters to us; the takeaway for you is simple reassurance that the work beneath your tiles is done properly.

Wet areas

Internal wet areas are waterproofed to the standard the area demands.

Bathrooms

Bathrooms, ensuites and powder rooms — including full-height shower waterproofing.

Laundries

Laundries and utility wet areas, where water is part of daily use.

Balconies

External balconies and decks over living spaces, where applicable, with falls and drainage planned in.

Internal wet areas

Any internal area exposed to water or moisture, assessed and waterproofed appropriately.

Installed to Australian Standards
Installed to Australian Standards
Protects your home for decades
Full wet-area coverage, corners and junctions reinforced
Correct curing before any tiling
Flood testing where applicable
Waterproofing gallery 1
Waterproofing gallery 2
Waterproofing gallery 3

Where this is used

Suited to considered spaces.

Bathrooms
Ensuites
Laundries
Wet Areas
Balconies

Why Wells Brothers

The standard clients return for.

Exceptional Craftsmanship

Every surface installed with measured precision and respect for the material.

Premium Materials

We work only with quality stone, tile and installation systems.

Luxury Finishes

A finishing standard suited to the most considered architectural homes.

Reliable Project Delivery

Disciplined scheduling that protects the programme of the wider build.

Our process

The project journey.

A clear, architectural approach from first conversation to final review.

01

Preparation

Substrate made flat, sound and dry; movement joints and cracks addressed.

02

Surface Inspection

The substrate is checked for integrity and moisture before priming.

03

Priming

The correct primer is applied to bond the membrane to the surface.

04

Membrane Installation

Membrane applied in the correct coats and coverage, corners and junctions reinforced.

05

Curing

The membrane is allowed to fully cure before any tiling begins.

06

Final Inspection

The completed waterproofing is inspected — and flood tested where applicable.

07

Tile Installation

Tiling begins only over a fully cured, sound waterproofing system.

Common mistakes

Common Waterproofing Mistakes

These are the mistakes we never make — and the reasons waterproofing fails when they are made. Best practice, not criticism.

Insufficient membrane coverage

Membrane applied too thin or in too few coats to form a continuous, reliable barrier.

Incorrect falls

Floor falls not laid to direct water to the drain, allowing it to pool and eventually find a way through.

Poor junction detailing

Corners, junctions and penetrations not reinforced — the points where leaks almost always begin.

Rushing curing times

Tiling over membrane that has not fully cured compromises the bond and the barrier itself.

Tiling over poor preparation

No membrane can compensate for an unsound, damp or cracked substrate.

FAQ

Frequently asked questions.

For balconies, decks, podiums and any wet outdoor area — yes. We install waterproofing systems engineered for exposure and substrate movement, with falls and drainage resolved during set-out.

Outdoor membranes must tolerate UV, thermal movement and standing water, and they must tie correctly into the building's structure. We detail movement joints and drainage outlets so water is managed, not trapped.

Good to know: a tiled outdoor surface is only as reliable as the waterproofing beneath it.

You may also be interested in

A correctly installed system should last the life of the tiled surface. We use quality membranes applied to manufacturer and Australian standards.

You may also be interested in

We apply waterproofing systems that meet and exceed Australian Standard AS 3740, with full attention to junctions and penetrations.

You may also be interested in

Yes. Waterproofing is itemised within our quotes so there is no ambiguity about what is included.

You may also be interested in

Areas we service

Across the Mornington Peninsula.

From coastal homes to architectural builds, Wells Brothers delivers premium tiling throughout the region.

MorningtonMount ElizaMount MarthaRyeRosebudSafety BeachDromanaFrankstonRed HillMornington PeninsulaSorrento

Tiling advice & ideas

From the journal.

Choosing Natural Stone for Australian Homes

15 Jul 2026

Choosing Natural Stone for Australian Homes

Read Article
Choosing Natural Stone for a Luxury Bathroom

18 Jun 2026

Choosing Natural Stone for a Luxury Bathroom

Read Article

Keep exploring

You may also be interested in.

Architectural home at dusk

Let's begin

Build It Right From the Beginning.

Exceptional bathrooms begin beneath the surface. If you're planning a renovation or new build, we'd be happy to discuss the right waterproofing solution for your project.

CallRequest a Free Quote